Skip to main content

Posts

Showing posts from July, 2021

It's been fixed! There is no longer an insane narrowing of the 280 Freeway in Santa Clara County.

UPDATE: BREAKING NEWS (8/15/21): They painted the final lines and messed it up again at Pagemill road (going down to three lanes and taking one as a dedicated exit and barely fixed the entry of the diamond lane... so it's still a little bit screwed up at one place... backups will not be eliminated entirely. DOH! It seems the California Department of Transportation has taken my suggestions made four years ago and decided to repave the 280 freeway so that there are four continuous lanes for the entire trip between San Francisco and San Jose.  My last report on this crazy backup causing 'improvement' was here:  https://www.wiigf.com/2016/11/a-proposal-to-fix-unnecessary-freeway.html. I pointed out that there was space to stop the backups and increase the traffic flow and was flabbergasted as to why they had designed the freeway to impede traffic flow. Now they've gone back and repaved it and fixed it. I have no need to repaint the lines anymore as the DOT has done it thems